Forster 2.2MW Pelton Turbine Completed and Ready for Shipment

SICHUAN, CHINA September 16, 2025 Forster, a leading Chinese hydro turbine manufacturer based in Sichuan, has announced the completion of manufacturing a high-capacity 2.2MW Pelton water turbine. The turbine is now prepared for shipment to a client in Eastern Europe, marking a significant step in the company’s expansion into the European renewable energy market.

000cb0
This shipment to Eastern Europe aligns with the growing demand for renewable energy infrastructure in the region. The European hydro turbine market is experiencing growth driven by EU directives mandating a significant increase in the share of renewable energy. This turbine’s capacity places it well within the range suitable for modernizing existing facilities or developing new, efficient small to medium-scale hydropower projects.

2.2MW Pelton Turbine technical specifications as follows

Net Head Hr 200 m
Design Flow Rate Qr 1.2 m³/s
Altitude 3000 m
Power P 1×2200 kW
Turbine Generator
Model CJA475-W-108/2×10 Model SFWE-W2200
Unit Flow Q11 / Rated Efficiency of Generator ηf 94%
Unit Rotating Speed n11 39.3r/min Frequency of the generator f 60Hz
Max Hydraulic Thrust Pt / Rated voltage of generator V 6300V
Rated rotating speed r 514r/min Rated current of the generator I 229.11A
Model Efficiency of turbine ηm 90.50% Excitation Brushless excitation
Max Runway speed nfmax 917r/min Connection way Direct connect
Rated Output Nt 2210kW Max runaway speed nfmax‘ 1028r/min
Rated Discharge Qr 1.2m3/s Rated rotating speed nr 514r/min
Turbine real machine efficiency ηr 87.50% Unit support form Horizontal 2 point

00148
The logistics of transporting large-scale energy equipment like this 2.2MW turbine are complex. The turbine’s components will be securely packed in fumigated wooden crates. Navigating multi-modal transport from China to Eastern Europe requires meticulous planning to overcome challenges such as potential road restrictions for oversized cargo. Forster’s experience in handling international shipments is crucial for ensuring timely delivery.

004e56
The design and manufacture of Pelton turbines involve sophisticated engineering to optimize energy conversion from water jet momentum to mechanical rotation. Forster’s turbines utilize advanced designs where high-pressure water jets impact the turbine’s buckets, transferring energy with minimal loss before water is discharged at a low velocity. Modern computational methods like Smoothed Particle Hydrodynamics (SPH) are used in the industry to simulate complex fluid dynamics and optimize turbine blade design for maximum efficiency and durability.


Post time: Sep-16-2025

Send your message to us:

Write your message here and send it to us