CHENGDU, China – Chengdu Forster Technology Co., Ltd., a leading Chinese hydro turbine manufacturer based in Sichuan, has announced the completion of manufacturing and forthcoming shipment of a custom-engineered 1.4MW twin-jet Pelton water turbine for a prominent renewable energy developer in Greece. This milestone underscores Forster’s expanding footprint in the European renewable energy market and its commitment to delivering high-performance hydroelectric solutions tailored to diverse operational requirements.
The Pelton turbine, a type of impulse turbine renowned for its effectiveness in high-head, low-flow applications, has been specifically designed for the Greek client’s new project aimed at enhancing the efficiency of an industrial bioenergy plant. The twin-nozzle configuration—a hallmark of advanced Pelton turbine design—delivers enhanced power performance through balanced dual-jet flow, ensuring optimal energy conversion even under varying operational conditions.
Technical Specifications
The 1.4MW hydropower system operates under the following parameters:
Net head: 185 meters
Design flow: 0.96m³/s
Installed power: 1 × 1,400 kW
Frequency: 50 Hz
Voltage: 400 V
Turbine Specifications (Model: CJA475-W-98/2×9.5) :
Rated speed: 600 rpm
Maximum runaway speed: 883 rpm
Rated output: 1,520 kW
Rated flow: 0.96 m³/s
Turbine model efficiency (ηm): 90.5%
Turbine true efficiency (ηr): 87.5%
Generator Specifications (Model: SFWE-W1600-10/1430) :
Generator rated efficiency (ηf): 94%
Rated frequency: 50 Hz
Rated voltage: 400 V
Excitation method: Brushless excitation
Connection method: Direct connection
Maximum runaway speed: 1,200 rpm
Unit support type: Horizontal two-point support
The system is also equipped with a 600mm diameter butterfly inlet valve featuring electric bypass and PLC interface for seamless grid integration and control.
Project Execution and Quality Assurance
The project was managed by Forster’s dedicated international team, which maintained close collaboration with the Greek client from the initial design phase through manufacturing, testing, and final logistics coordination. Prior to dispatch, the turbine generator underwent rigorous quality assurance and performance testing at Forster’s Sichuan facility to ensure full compliance with all specified technical and safety standards.
Forster’s Pelton turbines utilize advanced designs wherein high-pressure water jets impact the turbine’s buckets, transferring energy with minimal loss before water is discharged at low velocity. The twin-jet configuration further optimizes performance by balancing hydraulic forces on the runner, reducing vibration and extending operational lifespan.
Strategic Significance
This delivery highlights Forster’s growing international presence and its proven capability to execute complex, large-scale projects for clients worldwide. With a manufacturing capacity ranging from 20KW to 10MW per unit and a comprehensive product portfolio that includes Pelton, Francis, Kaplan, Turgo, and bulb tubular turbines, Forster continues to solidify its position as a trusted partner in the global transition toward sustainable energy sources.
The shipment to Greece marks another significant step in Forster’s European market expansion strategy, following the company’s successful delivery of a 2.2MW Pelton turbine to a client in Eastern Europe. As global demand for clean, reliable hydropower solutions continues to grow, Forster remains committed to delivering cutting-edge technology with uncompromising quality and customer-centric service.
Post time: Jun-25-2026
