Chengdu, China – FORSTER, a global leader in advanced hydropower solutions, today announced the successful delivery and acceptance of a fully customized Francis turbine runner for a major modernization project at a hydropower plant in [Specific Region, e.g., the Alps]. This milestone underscores FORSTER’s engineering excellence and its commitment to delivering tailored, high-efficiency solutions for its international clients.
The project involved the design, engineering, and manufacturing of a state-of-the-art Francis runner, specifically optimized for the client’s unique operational requirements. The plant, situated in a region with sensitive ecological standards and complex hydrological conditions, required a solution that would maximize energy output while ensuring operational flexibility and extended lifespan.
Addressing Unique Engineering Challenges
The client’s need for a runner capable of handling variable water flows and a specific head range presented a significant engineering challenge. FORSTER’s team of experts leveraged cutting-edge Computational Fluid Dynamics (CFD) analysis and advanced metallurgy to create a bespoke design.
Key features of the delivered Francis runner include:
Optimized Blade Geometry: Precisely engineered blades to minimize cavitation, reduce hydraulic losses, and ensure high efficiency across a wider operating range.
Superior Material Selection: Fabricated from high-grade, corrosion-resistant stainless steel, ensuring exceptional durability and longevity in challenging water conditions.
Precision Manufacturing: Utilizing state-of-the-art CNC machining and robotic welding techniques to guarantee dimensional accuracy and structural integrity, far exceeding industry standards.
A Partnership for a Sustainable Future
A spokesperson for the European client commented, “We selected FORSTER for this critical component due to their proven track record and technical expertise. From the initial design reviews to the final factory acceptance tests, their team demonstrated an unwavering commitment to quality and performance. This new runner is pivotal to our plant’s upgrade, and we are confident it will significantly boost our renewable energy generation for decades to come.”
The runner underwent rigorous Factory Acceptance Testing (FAT) at FORSTER’s facility, where all performance parameters were validated against the strict contractual specifications.
“The successful delivery of this custom Francis runner is a testament to the skill and dedication of the entire FORSTER team,” said Nancy Lan, Chief Projects Officer at FORSTER. “It exemplifies our core philosophy: to listen closely to our clients’ needs and engineer solutions that not only meet but exceed their expectations. We are proud to contribute to the sustainable energy landscape in Europe and to strengthen our partnership with this valued client.”
This project reinforces FORSTER’s position as a trusted partner for complex hydropower projects worldwide, providing innovative technology that drives the transition to a cleaner energy future.
About FORSTER:
FORSTER is a leading engineering and manufacturing company specializing in hydropower equipment. With over 60 years of experience, FORSTER provides turbines, generators, and comprehensive service solutions for new installations and modernizations across the globe, dedicated to harnessing the power of water efficiently and sustainably.
Post time: Oct-27-2025
