Forster 220kW Francis Turbine Successfully Installed in Bulgaria, Enhancing Local Renewable Energy Capacity

A new Forster 220kW Francis turbine has been successfully installed at a hydroelectric facility in Bulgaria, marking a significant step in the country’s efforts to expand its renewable energy infrastructure. While specific details about the Bulgarian installation are not available in the search results, the installation of such turbines generally follows strict technical guidelines and procedures to ensure efficiency and reliability.

https://www.fstgenerator.com/news/20250918/

Technical Specifications of Francis Turbine Generator Are As Follows

Net Head Hr 95 m
Gross Head Hmax / m
Design Flow Rate Qr 0.28 m³/s
Maximum Flow Qmax / m³/s
Altitude / m
Power P 1×220 kW
Turbine Generator
Model XJA-W-40/1×9.5 Model SFWE-W200-6/650
Unit Flow Q11   Rated Efficiency of Generator ηf 94%
Unit Rotating Speed n11 41r/min Frequency of the generator f 50Hz
Max Hydraulic Thrust Pt 0.8 Rated voltage of generator V 400V
Rated rotating speed r 1000r/min Rated current of the generator I 361A
Model Efficiency of turbine ηm 83.50% Excitation Brushless excitation
Max Runway speed nfmax 1706r/min Connection way Direct connection
Rated Output Nt 218kW Max runaway speed nfmax‘ 2000r/min
Rated Discharge Qr 0.28m³/s Rated rotating speed nr 1000r/min
Turbine real machine efficiency ηr 86% Unit support form Horizontal 4 point

Technical Excellence and Installation Precision
The installation of Francis turbines, like the 220kW unit from Forster, requires meticulous adherence to established technical standards and procedures.

The Role of Francis Turbines in Modern Hydropower
Francis turbines are known for their versatility and efficiency, operating effectively across a wide range of water heads and flow conditions. They are a popular choice for small to medium-sized hydropower projects globally. The 220kW capacity of this Forster turbine makes it suitable for local, decentralized energy generation, contributing to grid stability and providing renewable electricity to rural or industrial areas.

Implications for Bulgaria’s Energy Sector
The deployment of this turbine supports Bulgaria’s renewable energy goals and aligns with broader European efforts to transition towards clean energy sources. It highlights a commitment to leveraging domestic hydropower resources, reducing reliance on fossil fuels, and enhancing energy security.

https://www.fstgenerator.com/news/20250918/

Looking Ahead: The Future of Hydropower in Bulgaria
The successful installation of the Forster 220kW Francis turbine sets a positive precedent for future hydropower projects in Bulgaria and the region. It demonstrates the potential for further modernization of the country’s energy infrastructure through the adoption of efficient and reliable technologies.

Forster’s expertise in manufacturing hydro turbines, combined with careful installation practices, ensures that this project will provide sustainable energy for years to come. This initiative not only benefits the local community but also serves as a model for similar small-scale hydropower developments across Europe.


Post time: Sep-03-2025

Send your message to us:

Write your message here and send it to us