High Efficiency Alternative Energy Hydropower Project Hydro Pelton Tubine Generator For Hpp
Generator type:SFW250-8/740
Frequency:50Hz/60Hz
Certificate:CE/ISO9001/TUV
Voltage:380V/400V/440V/6300V
Efficiency:92%-96%
Flow Rate(m3/s):1.2
water head:300m
Product Details
High Efficiency Alternative Energy Hydropower Project Hydro Pelton Tubine Generator For Hpp
Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.
Hydro turbine generator is droved directly or indirectly by hydro turbine. The rotating speed is less than 1500r/min, with horizontal and vertical arrangement. Excitation mode with brushless and static silicon type.
Components including stator, rotor,base frame, bearing, excitation motor or collecting ring. The outlet voltage from 400V to 13.8KV, and frequency could be 50Hz or 60Hz, output from 50Kw to 50Mw. Our generator are high efficiency, reliable, manufacture and tests all follow related IEC standards.
Product features
With the in-depth development of water resources, there are many high-lying watersheds that need to be developed. For example, the Yarlung Zangbo River in China has a drop of more than 2,000 meters. It is unrealistic to build a dam at the same time (considering an international river at this time). Therefore, the impact turbine has become the first choice. Impact turbines have the following main advantages:
1. Adapt to the situation where the flow rate and head ratio are relatively small.
2. The weighted average efficiency is very high and has high efficiency throughout the operating range. In particular, the water bucket turbine is now advanced and can average more than 91% efficiency in the 30% to 110% load range.
3. Strong adaptability to head changes
4. It is also very suitable for the ratio of pipeline to head.
5. The amount of excavation is small.
6.suitable for high head,small flow and flow changes in large runoff hydropower station.
7.With the power plant investment is small,compact units structure characteristics.
8.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
9.Suitable for high head,small flow station in mountainous area.
10.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Product Parameters
Pelton tubine generator unit
Generator
Gevernor or Regulating work
Valve
Turbine
Type
Water head(m)
Discharge (m³/s)
Output(kw)
Speed (r/min)
Type
Capacity (kw)
CJA475-W-125/2x14
137
1.541
1739
375
SFW1600-16/2600
1600
CJWT- II BWT-6000
DN800
157
1.662
2151
SFW2000-16/2600
2000
183
1.783
2688
428.6
SFW2500-14/2600
2500
214
1.941
3422
SFW3200-14/2600
3200
248
2.082
4255
500
SFW4000-12/2600
4000
CJWT- II BWT-10000
287
2.237
5291
SFW5000-12/2600
5000
CJA475-W-140/2x14
116
1.429
1366
300
SFW1250-20/2600
1250
CJWT- II BWT-6000
DN800
137
1.541
1739
333.3
SFW1600-18/2600 SFW2000-18/2600
1600
157
1.662
2151
2000
183
1.783
2688
375
SFW2500-16/2600
2500
214
1.941
3422
428.6
SFW3200-14/2600
3200
248
2.082
4255
SFW4000-14/2600
4000
CJWT- II BWT-10000
287
2.237
5291
500
SFW5000-12/2600
5000
333
2.417
6632
SFW6300-12/2600
6300
400
2.495
8421
600
SFW8000-10/2600
8000
CJA475-W-140 /2x16
114
1.851
1739
300
SFW1600-20/2600
1600
CJWT- II BWT-6000
132
1.977
2151
SFW2000-20/2600
2000
153
2.132
2688
333.3
SFW2500-18/2600
2500
179
2.32
3422
375
SFW3200-16/2600
3200
CJWT- II BWT-10000
DN 1000
207
2.495
4255
SFW4000-16/2600
4000
240
2.675
5291
428.6
SFW5000-14/2600
5000
279
2.884
6632
500
SFW6300-12/2600
6300
Product Pictures
1.Pelton hydro turbine
2.Generator
3.Runner
4.Governor and Excitation Device
5.Transformer
Installation Picture
Our Workshop
Forster Turbine Advantages
Engineering Case
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.