2,Turgo turbine generators series, e.g. vertical type and horizontal type.
3,Tubular turbine generators series, e.g. Bulb type and shaft extension type
4,Francis turbine generators series
5,Impulse turbine generators series and double turbine generators series and so on.
Product features:
1,suitable for high head,small flow and flow changes in large runoff hydropower station;
2.With the power plant investment is small,compact units structure characteristics;
3.Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency;
4.Suitable for high head amall flow station in mountain area;
5.A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area.
Product parameters:
Turbine parameters
Generator parameters
Other detailed parameters
Model
Design head(m)
Under the design head
Design speed(r/min)
power
(kw)
rated speed
(r/min)
For other detailed parameters and requirements, please consult the business personnel
traffic
(m/s)
the output(kw)
HL110-WJ-50
Turbine performance data
20.2
0.385
63.1
553
55
600
23.6
0.437
84.5
598
75
600
28.7
0.482
111.3
659
100
600
33.4
0.506
138.2
711
125
750
38.8
0.561
178
766
160
750
45.5
0.608
221.7
830
200
750
53
0.655
275
895
250
1000
61.3
0.705
353.4
963
320
1000
Product pictures:
Other products
Company Information
Our workshop
Advantages
Packaging & Shipping
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.