hydroelectric generator

Home > NEWS> Forster news

NEWS
Hot Products
Contact us

Email: nancy@forster-china.com

Phone:+86 28 8701 3699

Adderss 3rd East of Guanghua Road, Qingyang Dist. Chengdu, Sichuan province, China

Fight The Covid-19 Virus, Order Turbine Now And Get Free Masks

Author: source: date: 2020-03-19 10:01:40

Fight The Covid-19 Virus,We Are With You,Order Turbine Now And Get Free Masks

微信图片_20200317165921


As Covid-19 Virus spreads around the world, Chengdu Forster Technology in order to help customers fight against the coronavirus, resume work and resume production as soon as possible, and hold preferential activities. 
All customers who order hydro turbines from Forster will get free face masks, and all customers can buy masks from Foster at factory price

face mask disposable1 (9)

Face mask features : 


1. Disposable three-layer mask is made of two layers of non-woven fabric and filter paper;


2. Disposable three-layer masks are made of two layers of fiber non-woven fabrics, which are professionally used for medical and sanitation, and an additional layer in the middle has a filter germ of 99% or more. Full plastic strip, without any metal, with vapor permeability, comfortable.


3. Filtering effect B.F.E is as high as 99%, especially suitable for electronics factories;


4. Disposable activated carbon mask is made of 28g non-woven fabric on the surface layer, and the first layer in the middle is filtered by bacteria-proof filter paper to prevent bacteria by 99%.


5. The second layer in the middle is made of activated carbon fiber and activated carbon cloth, which is a new type of highly efficient adsorption and filtering material.

Brand
Forster
Material
3ply (non-woven+Anti-bacterial meltblown cloth+non-woven)
Size
17.3*9.3cm
Type
Daily protective
Color
Blue
Certificate
CE & FDA Approved
face mask disposable1 (3)


FAQ

 
Q1, Which turbine should I choose?
 Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
 
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
 
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
 
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
 
Q5, What is an acceptable MOQ?
 For this product, our acceptable MOQ is 1 set.
 
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
 
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:www.fstgenerator.com

Technical support:

Bailla