Production of 1.2MW Francis Turbine Generator with Russian Customer Installation Capacity

Author: source: date: 2018-12-27 11:58:53

In the production of 1.2MW Francis Turbine Generator with total installed capacity by Russian customers, after three months of communication, Russian customers visited our factory in August this year and finally placed an order in September.

francis turbine4.JPGThis is our new customer's first order for Russian power plant, 1.2MW Francis Turbine. Our customer is a professional hydroelectric installation company in Russia, which is located in Moscow. During the Russian World Cup in June, we met at the Russian Oil and Gas International Fair. Their company has been engaged in installation of hydropower projects for more than 20 years and has very rich experience. Their project won the tender in June. According to customer's requirements, we constantly revise the design scheme, and devote ourselves to customer's complete satisfaction. At the same time, they have great confidence in Ford's Made in China and the high cost-effective price of Made in China, as well as perfect after-sales service, are very satisfied. That prompted our cooperation. And we have reached an oral agreement that Forster Technologies Limited will be the preferred supplier for next year's two projects if the bidding is successful. This is a great affirmation of our products and services. The project of the 1.2MW Francis Turbine Unit is just beginning. The project of the 1.2MW Francis Turbine Unit is just beginning. The unit signed a contract in September. The overall equipment includes: 1, Turbine 2, Generator 3, Valve 4, Microcomputer Governor 5, Five-in-one integrated control screen. The delivery time is expected to be February 2019.
francis turbine7.JPGThe following are the detailed parameters of 1.2MW Francis Turbine Generator Unit.

Technical Parameters:

Rated Head

Hr

46

m

Capacity

P

1*1200

kw

Hydro Francis Turbine (1*1200kw)

Turbine

Generator

Model

HLA743-WJ-71

Model

SFWE-W1200-8/1180

Unit Flow Q11

0.942 m3/s

Rated Efficiency of Generator ηf

94%

Unit Rotating Speed n11

78.51 r/min

Efficiency of the generator f

50Hz

Max Hydraulic Thrust Pt

7.9t

Rated voltage of generator V

660V

Rated rotating speed r

750r/min

Rated current of the generator I

1312A

Model Efficiency of turbine ηm

93%

Excitation

Brushless excitation

Max Runway speed nfmax

1472r/min

Connection way

Direct connection

 Rated Output Nt

1277kW

Max runaway speed nfmax‘

1472r/min

Rated Discharge Qr

3.22m3/s

Rated rotating speed nr

750r/min

Efficiency of the Turbine ηr

87%

Support way

Two- fulcrum

Number of blades

14

Generator rated power factor

0.8

francis.JPGfrancis turbine6.JPGfrancis1.JPG

FAQ:

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Contact us

Tel:+86 28 87013699

Fax:+86 28 87362258

What's App:+86 13540368205

skype:  vacorda

E-mail:   sales@forster-china.com

Facebook1:  https://www.facebook.com/hydroturbine

Facebook2:  https://www.facebook.com/forster.George1988

Twitter:  https://twitter.com/nancyLan4

Linkedin:  https://www.linkedin.com/in/george-huang-6b9576163/detail/

Google+:  https://plus.google.com/102915545855302703096

hydro turbine generator

Technical support:

Bailla