Installation of the 850kw hydropower project in Albania

Author: source: date: 2018-11-06 11:49:19

This is incredible. Do you remember our 850KW project in Albania last month? 

Our client friend has been installed, he seems happier, the first time to send us photos.

Francis turbine: 1*850KW 

Hydraulic turbine: HLA708 

Generator:SFWE-W850-6/1180 

Governor: GYWT-600-16   

Valve: Z941H-2.5C DN600

francis genaratorfrancis geneartors

Since our Albanian customers themselves are manufacturers of control and safeguard systems for hydropower stations, we only supply them with turbine, 

generator, valve, transformer and governor this time. And our customers are very professional. They have their own team of engineers for civil engineering, installation and commissioning. The work efficiency is very high.

francis turbinehydro generator

Moreover, our dear customers warmly invited us to visit their hydropower station and company in Albania in December, and by the way, 

negotiate the procurement plan for their next project. We will see you in Albania in December.

francis turbine generrator

FAQ:

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.