China domestic project 2*3200kw Francis Turbine Generator Unit

Author: source: date: 2019-11-15 14:06:51
China domestic project 2*3200kw Francis Turbine Generator Unit,
The total installed capacity is 6400kw (2*3200), and the maximum power generation capacity can reach 7mw.

The power station is operating well in view of 2013.